Top Patch Contractor Kit – Asphalt & Concrete Repair | Half Pallet (12 Kits)
The Top Patch Half Pallet (12 Kits) gives contractors a tough, pro-grade fix for spalling concrete or asphalt. No heat, no compaction. Just mix, pour, and you’re done. Cures in 30 minutes so you can move on to the next job.
Save $419 when purchasing a half pallet!
- For long-lasting, all-weather repairs
- 3-Year Performance Warranty
- Includes resin, aggregate, and curing agent

Availability: In stock
Have questions? We’re here to help!

Speak to an Asphalt Expert!
The Heavy-Duty Pavement Repair Solution for Large Jobs
Tackling commercial or municipal pavement repairs? The Top Patch Contractor Kit – Half Pallet (12 Kits) is built for professional contractors who need to patch large areas fast. Each kit includes everything you need to complete repairs in just 30 minutes—no cut-out, heating, or compaction required.
This contractor-grade system permanently bonds to both asphalt and concrete, delivering reliable results even in freezing weather. Whether you're patching a high-traffic parking lot or sealing potholes on city streets, Top Patch gives you long-lasting durability and time-saving efficiency.
- 12 full repair kits included – Scalable pavement patching at your fingertips
- All-weather performance – Installs rain, shine, or snow
- Chemically bonds to asphalt and concrete – No primer or extra binder needed
- Traffic-ready in just 30 minutes – Rapid return-to-service for busy lots
- Cold-applied with no compaction – No heating tools, no hassles
- Self-leveling resin – Fills deep potholes and surface cracks with ease
Need smaller or larger volume? We also offer this kit in 6 Kit and Full Pallet (24 Kits) versions.
Real Results from the Field: Before & After Top Patch Repairs
See how Top Patch delivers professional-grade repairs for asphalt and concrete. From potholes to delaminated concrete, these real-world examples show just how fast and clean your pavement can be restored.
Built to Handle Drift Tracks — Ready for Your Blacktop Repair Jobs
“We have tried several different products on our parking lot where we also have drift events. All of these other patches have failed during the drift event as soon as they started going over them. We tried Top Patch for our last events and were able to successfully drift over it the entire day with the patch showing no signs of wear or cracking, like we had experienced with other products.”
Brad Cannon
Sr. Mgr. Financial Ops & Drag Strip Race Director, World Wide Technology Raceway, Madison, IL
Top Patch’s strength and durability have been proven in the harshest racing conditions. If it holds up under drift and IndyCar racing, imagine the results it can bring to your toughest repair jobs.
Recommended Uses
- Commercial parking lots with potholes and cracking
- Municipal roads, curbs, and ramps
- Warehouse and loading zone pavement
- Motorsport venues and racetracks
- Cold weather emergency repairs
- Asphalt and concrete joint seams
- School zones, sidewalks, and driveways
What’s Included in Each Kit
- 23 lbs of resin-based pre-mix (per kit)
- 5-Gallon UN-rated pail with secure lid
- Pre-measured aggregate (choose Smooth or Super Duty)
- Sealed bottle of curing agent
- Free 9" yellow trowel – For effortless application
- Free protective gloves – Keeps hands safe during use
This listing includes 12 Kits (Half Pallet)
Select the Right Aggregate for Your Surface
- Smooth Finish Aggregate (Standard) – Best for newer asphalt, curbs, and cosmetic touch-ups
- Super Duty / Racetrack Aggregate (Deep Fill) – Ideal for porous asphalt, deep potholes, and high-traffic surfaces
Minimum installation depth is ¼". For potholes deeper than 6", pre-fill with clean ⅜” dry aggregate before topping with Top Patch.
Step-by-Step Application Guide
- 1. Prepare the Area – Clean with a leaf blower or broom to remove dust, dirt, and water.
- 2. Mix the Resin – Blend the resin alone for 1–1.5 minutes.
- 3. Add the Cure – Mix in the sealed bottle of curing agent for another 1–1.5 minutes.
- 4. Add Aggregate – Pour in aggregate and mix thoroughly until uniform.
- 5. Pour & Finish – Use the included trowel to apply evenly. For deeper repairs, use a tamping tool.
No heating or compaction required. Cures in just 30 minutes—even in cold climates.
Storage & Handling
- Storage Temperature: Keep curing agent at 65–75°F for best performance
- Dry Location: Store resin and aggregate in a cool, dry, covered area
- Shelf Life: 12 months with proper storage
- Disposal: Use acetone to clean tools; dispose of cured product in garbage
- Safety: Use gloves and safety glasses during mixing and application
Want More Tips?
Check out our Complete Guide to Asphalt Patching & Pothole Repairs or explore more Asphalt Patch Repair Options to find the right solution for every job.
RECOMMENDED TOOLS FOR INSTALLING TOP PATCH
- Mixing & Application
- Cleaning & Prep
- Handling & Safety
- Miscellaneous
- Concrete Mixing Drill – Ensures a consistent blend of the pre-mix and curing agent.
- Concrete Plastic Mixing Tub (Optional) – Helps contain and mix the repair material efficiently.
- Concrete Mixing Hoe – Useful for manual mixing when a drill is not available.
- EggBeater Mixing Blades for Drill – Enhances mixing efficiency, preventing clumping.
- Pool Trowel – For smoothing out and leveling the repair.
- Urethane Grout Float – Ensures proper spreading and finishing.
- Leaf Blower – Clears dust and debris for a cleaner repair area.
- Heavy-Duty Wipers – Absorbs excess moisture for better adhesion.
- Nitrile Gloves – Protects hands from chemicals.
- Safety Glasses – Prevents debris from getting into your eyes.
- UN Pail Opener – Makes it easier to open and reseal the pail.
- Utility Knife (Fixed Blade) – Useful for cutting open packaging or materials.
- Flat Screwdriver – Helps with quick adjustments and mixing needs.
- 5-Gallon Empty Pail with Pour Spout Lid – For mixing and handling materials.
- Acetone – Used for cleaning tools after application.
- Paint Roller Plastic Tray – Assists in controlling the spread of materials.
Using the right tools ensures your asphalt repair lasts longer, cures properly, and provides a professional finish.
Real Results from the Field: Before & After Top Patch Repairs
See how Top Patch delivers professional-grade repairs for asphalt and concrete. From potholes to delaminated concrete, these real-world examples show just how fast and clean your pavement can be restored.
ANSWER FOR YOUR CONCERNS
Questions | Answers |
---|---|
How long does it take to install Top Patch? | Installation is quick and efficient, typically taking about 30 minutes from start to finish. |
What is the largest pothole size Top Patch can repair? | Top Patch can handle potholes of any size, including alligator cracking, slippage, raveling, and delamination. |
Can Top Patch be used for small repairs? | Yes! Top Patch works for areas as small as 2-3 inches in diameter and ¼ inch deep. |
Does Top Patch comply with ADA requirements for height offsets? | Yes, it can be applied in thin layers of 0.25 inches to meet ADA compliance. |
Is Top Patch suitable for filling cracks? | Yes, it seals cracks and bonds both sides together for long-term durability. |
How much area does one Top Patch Kit cover? | Each kit covers just over half a cubic foot, enough to patch 3 average potholes with 2 kits. |
Does Top Patch have an odor during application? | Yes, but it’s not harmful and dissipates once cured. Open pails in open air. |
Is special equipment required for installing Top Patch? | A recommended toolset under $400 is ideal, though a budget set around $60 can be used. |
How long does Top Patch last once applied? | Top Patch lasts 5–10 years and comes with a 3-year warranty. |
Can Top Patch support heavy vehicles? | Yes, it's built to support all traffic, including heavy-duty vehicles. |
What type of finish can be expected after using Top Patch? | It mimics hot mix asphalt with a smooth, self-leveling finish that won't settle. |
Are different aggregate sizes available for Top Patch? | The standard size is 1–4mm, with smaller custom options available. |
How does Top Patch differ from traditional cold patch products? | It uses a high-performance resin and doesn’t require compaction. It’s self-leveling and cures to a hot mix finish. |
Can Top Patch be used on surfaces other than asphalt? | Yes, it works on concrete driveways and sidewalks and can be colored to match surroundings. |
What is the shelf life of Top Patch? | Approximately two years. |
In what weather conditions can Top Patch be installed? | Top Patch works in most weather. Use heaters to remove snow or ice. For cold conditions, use Top Patch Fast. |
How should Top Patch be stored? | Store Cure at room temperature; Pre-Mix and Rock can be stored in a secure place. |
How long does Top Patch take to cure? | Typically 20–30 minutes. Cure time can be adjusted by the amount of Cure used. |
How should excess Top Patch be disposed of? | Clean tools with acetone. Dispose of unused material in an empty garbage bag. |
Does rain affect Top Patch after it has cured? | No, rain has no effect once cured. |
What if I don’t have enough Top Patch for my project? | For deep potholes, fill halfway with dry ¼” aggregate and top with at least 3” of Top Patch. You can always add more later. |
What surfaces does Top Patch adhere to? | It adheres to asphalt, worn asphalt, concrete, and even itself. |
What surface preparation is necessary before applying Top Patch? | Remove dust, dirt, water, snow, and ice to ensure strong adhesion. |
What personal protective equipment should be used when working with Top Patch? | Use nitrile gloves and safety glasses during installation and mixing. |
Is a bonding agent or primer required before applying Top Patch? | No, Top Patch is its own binder—no primers needed. |
How do I clean tools after using Top Patch? | Use acetone. Wipe off wet material or soak tools overnight if cured. |
Have questions? We’re here to help!

Speak to an Asphalt Expert!
Show Discount box | No |
Item Returns | This item can be returned |
Product Name | Top Patch Contractor Kit – Professional Asphalt Repair (Half Pallet – 12 Kits) |
Pre-Mix Weight | 23 lbs per kit |
Pail Size | 5-Gallon UN Pail with Lid |
Aggregate | Sandbagged Aggregate |
Curing Agent | Sealed Bottle |
Shipping Weight | 734 lbs |
Shipping Dimensions | 36 x 48 x 35 |
Coverage | Approx. 2–3 sq. ft. at 1” thick per pail |
Application Temperature | Works in all-weather conditions, including below freezing |
Cure Time | Traffic-ready in 30 minutes |
Tools Included | FREE 9” Disposable Trowel (Yellow Spreader), FREE Protective Gloves |
Recommended Additional Tools | Concrete Mixing Drill, Tamping Tool, Broom/Blower |
Shelf Life | Up to 2 Years |
0
5 stars
0% (0)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
0% (0)
Share your thoughts with other customers
Top customer reviews
No reviews