Preformed Thermoplastic Road Marking Lines – 4" x 3' | Durable, Reflective, Easy Install
- Covers up to 3 feet per line segment
- Installs in minutes with a propane torch
- Reflective glass beads for night visibility

Availability: In stock
Make It a Bundle
Have questions? We’re here to help!

Speak to an Asphalt Expert!
Preformed Thermoplastic Road Marking Lines
Get crisp, high-visibility pavement lines without stencils, mess, or paint curing delays. These preformed thermoplastic road marking lines are ready-made for quick heat-bonded application on asphalt and concrete surfaces. Designed for durability and visibility, they’re used by contractors and municipalities for:
Overview & Use Cases
- Lane markings on roadways and highways
- Parking lot lines and directional guides
- Pedestrian safety zones and crosswalks
- Airports, school zones, and industrial areas
Whether you're striping a new parking lot or refreshing worn markings, these 4" x 3' thermoplastic lines make the job fast, professional, and cost-effective. For more custom designs, pair with our wide selection of parking lot stencils.
Key Features & Benefits
- Superior Durability: Withstands traffic, weather, and heavy wear
- Reflective Visibility: Integrated glass beads enhance nighttime safety
- Fast & Easy Application: No paint. No stencils. Just heat and go
- Ready-to-Use Format: Save time with pre-cut, uniform strips
- Eco-Friendly: No solvents, meets environmental safety standards
- ROI-Focused: Reduced labor costs, faster application, fewer callbacks
Looking for even more application options? Browse our full line striping equipment selection to expand your striping setup.
Application Instructions
What You’ll Need:
- Propane torch or heat gun
- Asphalt blower or rotary broom for debris removal
- Surface cleaning tools
- Primer (for concrete surfaces)
Step-by-Step:
- 1. Prep the Surface: Clear dirt and debris using a blower or rotary broom. If applying to concrete, use primer and let dry for 5–10 minutes.
- 2. Position the Line: Place the pre-cut strip where needed.
- 3. Apply Heat: Use a propane torch to evenly heat the line until it melts and adheres to the surface.
- 4. Cool Down: Let the line cool for about 30 minutes—then it's traffic-ready.
Pro Tip: Use a handheld roller while heating for a tighter bond and a more seamless look.
Storage & Handling
- Shelf Life: Up to 12 months in original packaging
- Storage Temp: Keep flat, dry, and between 50°F–90°F
- Avoid Humidity: Keep away from moisture before installation
- Handling Advice: Store indoors and out of direct sunlight
Why Choose Preformed Thermoplastic Lines from Asphalt Kingdom?
When you need precision, safety, and speed, these preformed thermoplastic lines are the answer. They're engineered for reliability and trusted across high-traffic areas like highways, parking lots, and industrial sites. The pre-cut design eliminates guesswork, while glass beads enhance visibility even in low-light conditions.
Prefer painted lines instead? Check out our traffic marking paint for alternative solutions. You can also increase reflectivity with Hi-Visibility Glass Beads for manual applications.
When you buy from Asphalt Kingdom, you're getting expert-vetted products, contractor-trusted performance, and unmatched customer support.
ANSWER FOR YOUR CONCERNS
Questions | Answers |
---|---|
What surfaces can I apply these thermoplastic lines to? | They can be applied directly to asphalt. For concrete, use a primer to ensure strong adhesion. |
How soon can traffic drive over the lines? | About 30 minutes after installation—once the material has fully cooled. |
What tools are required for installation? | You’ll need a propane torch, surface cleaning tools like a blower or broom, and a primer for concrete. |
Can I apply this product alone? | Yes. One person can handle cleaning, placement, and heating. It’s simple and fast. |
How should I store unused thermoplastic lines? | Store flat in a dry, cool location between 50°F and 90°F. Avoid humidity and direct sunlight. |
Have questions? We’re here to help!

Speak to an Asphalt Expert!
Show Discount box | No |
Item Returns | This item can be returned |
Weight | ~1.5 lbs per 3' line segment |
Coverage | 3 linear feet per segment |
Curing Time | <30 minutes for traffic-ready |
Melting Temp | ~392°F (200°C) |
Application Method | Propane torch heat application |
Shelf Life | Up to 12 months (stored properly) |
Width | 4 inches |
Height | 0.1 inches (approx.) |
Length | 36 inches (3 feet) |
Surface Compatibility | Asphalt, Concrete (with primer) |
Other Key Specs | Reflective, Pre-Cut, White, Yellow, or Blue |
0
5 stars
0% (0)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
0% (0)
Share your thoughts with other customers
Top customer reviews
No reviews